Ansta Studio
Back to all tools

Panel Door & Window

DWS

Door Window Schedule: a schedule table following the format already in the project, plus an elevation drawing of every type.

How it works

  • The elevation drawings are built on a DWS rack: one host wall, one unit per type, then an elevation view cropped to the opening.
  • The table follows the schedule format already present in the project rather than introducing a new one.

Worth knowing

The host wall and the units on the DWS rack MUST stay in the model. Delete them and the elevation drawings go blank.